From
Paradyme Painting
Tonow Tokunaga
3451 Ambrosia Ave
Victoria, BC V8C 0K4
CA
To
G and S Construction
513 Gurunanak Lane
Victoira, BC V9C 0M2
CA
Date
August 24, 2023
Estimate Number
2416
Expiration Date
May 25, 2021
Estimate Total
$79,800.00
  1. Task
    Rate
    Qty
    Amount

    661 Hoylake ave Interior Painting on block 1 and 2. Total of 6 units 9800 sq feet, 2 blocks of 3 includes the garage. Premium paint.  A cheaper paint option is available.   $1200 per unit less or $7200 less for all 6 units. We can also do a per unit option.  I would highly suggest using the premium paint. Paint product sheets are attached in email. 

    $24,500
    2
    $49,000
  2. Exterior Painting. Includes both blocks 1 and 2.  Man lift will be provided. Premium products only.

    $13,500
    2
    $27,000
Subtotal $76,000.00
Taxes $3,800.00
Total $79,800.00

Notes

WCB # 2004 89 269

GST # 793 725 540

Insurance Policy # LMFI1553

Terms

INTERIOR SCOPE

  • Walls when ready will be sealed with Hi – Hide drywall sealer on areas as needed.
  • The following areas will receive a primer coat and at least 2 top coats of the paint of my choice.
  • Ceilings ( flat ), Walls ( eggshell ), Trim and Doors ( semi – gloss ).Once

 

  • 3 Colors in total. 1 for the main wall color, 2 for the accent walls color and 3 for the trim and doors.
  • $250 per extra color / colors of if in a different sheen or paint product.
  • All walk in closets will have white ceilings and the according wall color.
  • All regular closets will be 1 color through out (ceilings will be in the wall paint).
  • Bathrooms ceilings in the trim paint if desired.

 

INTERIOR PAINTING PROVISIONS

 

  • To be completed in 2 stages.
  • Stage 1 includes drywall sealer, an additional coat on the walls, and final 2 coats on the ceilings.
  • Stage 2 finalize to completion.
  • Anything there after will be considered trade damage and will charged out as an extra

 

  • All finished floors including concrete in the garage is to be covered at least 90 % by the general contractor.
  • All drywall in the entire house including the garage is to be ready at the same time before I begin sealing the house.
  • Areas to be swept clean of all construction debris, sockets to be vacuumed out before sealer stage begins.
  • If the sealer is done in separate sections per unit a $500 spilt fee will incur.
  • Once the ceilings are completed all pot lights and none hanging lighting under 6 inches are to be installed and energized before the 2nd stage begins otherwise walls should not be finalized.

 

  • The house is to be swept, clean of any construction waste before we’re expected to commence work for the 2nd stage.
  • No other trades in the unit while our team is there. A $35 fee / hr / person would be charged otherwise.
  • Shelving in the closets to be installed after trim and walls are painted. An extra $100 to $500 per closet fee if installed before hand.
  • Toilets to be installed after trim and walls are completed. An extra $60 per toilet if installed before hand.
  • Power, sufficient heat and water to be provided by the GC.

 

  • If I do any work outside the above scope an hourly charge of $70 per hour plus material CCO will be requested.
  • This includes cleaning up after other trades.
  • Once there is any furniture moved into the unit all work there after will be considered extra.
  • Job is completed in 2 phases
  • Anything there after will be considered extra if there is any trade damage and or additional trim or doors added after my second and final visit.

 

EXTERIOR PREPARATION AND SPECIFICS

 

 

  • Exterior caulking completed by siders but we can do minor finishing touches.
  • Any hardy panels aluminum trim will also be prepped by the siders or we can do as an extra.
  • 3 colors only 2 for the body and 1 for the trim.  anything outside of this will be extra.
  • Any downspouts put up before painting will not be our responsibility if they incur any damage.

NOT INCLUDED

 

  • Stain grade wood, fiber glass gel stain
  • Soffits
  • exterior or interior handrails.
  • stair treads or risers
  • wainscotting, passthroughs, cabinets, shelving, crown moulding
  • adjacent buildings, sheds, etc.
  • Front doors wider than 40 inches.

 

Updated
August 24, 2023 @ 4:35 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:35 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:39 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:40 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:41 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:41 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:42 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:42 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:43 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:43 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:44 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:44 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:45 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:45 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:49 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:51 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 4:54 am

Estimate updated by Tonow Tokunaga.

Updated
August 24, 2023 @ 5:06 am

Estimate updated by Tonow Tokunaga.