From
Paradyme Painting
Tonow Tokunaga
3451 Ambrosia Ave
Victoria, BC V8C 0K4
CA
To
Sawyer Construction
PO BOX 37110, RPO
Millstream
Date
December 1, 2021
Estimate Number
465
Expiration Date
May 25, 2021
Estimate Total
$31,920.00
  1. Task
    Rate
    Qty
    Amount

    Interior Painting of Phase 2 done in 2 sections as discussed @ 517 Herald St based on the plans provided at approx 5800 sq ft 

    $30,400
    1
    $30,400
Subtotal $30,400.00
Taxes $1,520.00
Total $31,920.00

Notes

WCB # 2004 89 269

GST # 793 725 540

Insurance Policy # LMFI1553

Terms

INTERIOR SCOPE

  • Walls when ready will be sealed with Hi – Hide drywall sealer on areas as needed.
  • Curved walls will receive 2 coat of drywall sealer and 2 top coats.
  • The following areas will receive a primer coat and at least 2 top coats of the paint of my choice.
  • Ceilings ( flat ), Walls ( eggshell ), Trim and Doors ( semi – gloss ).Once

 

  • 3 Colors in total. 1 for the main wall color, 2 for the accent walls color and 3 for the trim and doors.
  • $250 per extra color / colors of if in a different sheen or paint product.

 

INTERIOR PAINTING PROVISIONS

 

  • To be completed in 2 stages per phase
  • Stage 1 includes drywall sealer, an additional coat on the walls, and final 2 coats on the ceilings.
  • Stage 2 finalize to completion.

 

  • All finished floors including to be covered at least 90 % by the general contractor.
  • All drywall in the entire building per phase is to be ready at the same time before I begin drywall sealer
  • Areas to be swept clean of all construction debris, sockets to be vacuumed out before sealer stage begins.
  • If the sealer is done in separate sections in each phase a $500 spilt fee will incur.
  • Once the ceilings are completed all pot lights and none hanging lighting under 6 inches are to be installed and energized before the 2nd stage begins.

 

  • The areas are to be swept, clean of any construction waste before we’re expected to commence work for the 2nd stage.
  • No other trades in the unit while our team is there. A $25 fee / hr / person would be charged otherwise.
  • Toilets to be installed after trim and walls are completed. An extra $60 per toilet if installed before hand.
  • Power, sufficient heat and water to be provided by the GC.

 

  • If I do any work outside the above scope an hourly charge of $65 per hour plus materials will be charged out.
  • This includes cleaning up after other trades.
  • Once there is any furniture moved into the unit all work there after will be considered extra.
  • Job is completed in 2 phases
  • Anything there after will be considered extra if there is any trade damage and or additional trim or doors added after my second and final visit @ $65 T&M

 

NOT INCLUDED

 

  • Stain grade wood, fiber glass gel stain
  • Soffits
  • exterior or interior handrails.
  • stair treads or risers
  • wainscotting, passthroughs, cabinets, shelving, crown moulding
  • adjacent buildings, sheds, etc.
  • Front doors wider than 40 inches.
  • intumescent coating
  • Exterior window prep.
Updated
December 1, 2021 @ 5:07 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:07 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:07 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:08 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:08 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:08 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:08 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:09 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:09 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:09 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:09 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:10 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:10 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:10 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:10 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:10 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:11 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:12 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:12 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:13 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:13 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:13 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:14 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:14 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:14 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:14 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:18 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:18 pm

Estimate updated by Tonow Tokunaga.

Updated
December 1, 2021 @ 5:24 pm

Estimate updated by Tonow Tokunaga.