From
Paradyme Painting
Tonow Tokunaga
3451 Ambrosia Ave
Victoria, BC V8C 0K4
CA
To
Baldev Construction
Buena Vista Lot 5
Victoria
Date
April 25, 2021
Estimate Number
132
Expiration Date
May 25, 2021
Estimate Total
$19,110.00
  1. Task
    Rate
    Qty
    Amount

    Interior and Exterior Painting on approx 3900 sq ft of new construction

    Pre existing areas are not included

    $18,200
    1
    $18,200
Subtotal $18,200.00
Taxes $910.00
Total $19,110.00

Notes

WCB # 2004 89 269

GST # 793 725 540

Insurance Policy # LMFI1553

Terms

INTERIOR SCOPE

  • Walls when ready will be sealed with Hi – Hide drywall sealer on areas as needed.
  • The following areas will receive a primer coat and at least 2 top coats of the paint of my choice.
  • Ceilings ( flat ), Walls ( eggshell ), Trim and Doors ( semi – gloss ).Once

 

  • 3 Colors in total. 1 for the main wall color, 2 for the accent walls color and 3 for the trim and doors.
  • $250 per extra color / colors of if in a different sheen or paint product.
  • All walk in closets will have white ceilings and the according wall color.
  • All regular closets will be 1 color through out (ceilings will be in the wall paint).

 

INTERIOR PAINTING PROVISIONS

 

  • All finished floors including concrete in the garage is to be covered at least 90 % by the general contractor.
  • All drywall in the entire house including the garage is to be ready at the same time before I begin sealing the house.
  • Areas to be swept and clean of all construction debris, sockets to be vacuumed out before sealer stage begins.
  • If the sealer is done in separate sections a $500 spilt fee will incur.
  • Once the ceilings are completed all pot lights and none hanging lighting under 6 inches are to be installed.

 

  • The house is to be swept and clean of any construction waste before we’re expected to commence work for the 2nd stage as well.
  • No other trades in the unit while our team is there.
  • Shelving in the closets to be installed after trim and walls are painted. An extra $100 to $500 per closet fee if installed before hand.
  • Toilets to be installed after trim and walls are completed. An extra $60 per toilet if installed before hand.
  • Power, sufficient heat and water to be provided by the GC.

 

  • If I do any work outside the above scope an hourly charge of $60 per hour plus materials will be charged out.
  • This includes cleaning up after other trades.
  • Once there is any furniture moved into the unit all work there after will be considered extra.
  • Job is completed in 2 phases
  • Anything there after will be considered extra if there is any trade damage and or additional trim or doors added after my second and final visit.

 

EXTERIOR PREPARATION AND SPECIFICS

 

  • cover any windows or any areas with a potential to get any undesired paint coatings.
  • Exterior caulking completed by siders but we can do minor finishing touches.
  • Any hardy panels aluminum trim will also be prepped by the siders or we can do as an extra.
  • 3 colors only 2 for the body and 1 for the trim.  anything outside of this will be extra.
  • Any downspouts put up before painting will not be our responsibility if they incur any damage.

NOT INCLUDED

 

  • Stain grade wood, fiber glass gel stain
  • Soffits
  • exterior or interior handrails.
  • stair treads or risers
  • wainscotting, passthroughs, cabinets, shelving, crown moulding
  • adjacent buildings, sheds, etc.

 

Updated
April 25, 2021 @ 7:07 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 7:42 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 7:43 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 7:44 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 7:45 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 8:21 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 8:39 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 8:48 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 8:52 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 8:56 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 9:02 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 9:04 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 9:07 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 9:11 pm

Estimate updated by Tonow Tokunaga.

Updated
April 25, 2021 @ 9:14 pm

Estimate updated by Tonow Tokunaga.