  1. Task
    Rate
    Qty
    Amount

    Interior painting on approx 950sq ft @ 660 Brookleigh.  Any extra work outside of scope will be completed T and M  hourly rate of $65.  

    $4,500
    1
    $4,500
Subtotal $4,500.00
Taxes $225.00
Total $4,725.00

Notes

WCB # 2004 89 269

GST # 793 725 540

Insurance Policy # LMFI1553

Terms

INTERIOR SCOPE

  • Walls when ready will be sealed with Hi – Hide drywall sealer on areas as needed.
  • The following areas will receive 2 top coats of the paint of my choice. If a 3rd coat is needed due to choice of top coat color such as white this may incur extra charges for time and material.
  • Ceilings ( flat ), Walls ( eggshell ), Trim and Doors ( semi – gloss ).Once

 

  • 3 Colors in total. 1 for the main wall color, 2 for the accent walls color and 3 for the trim and doors.
  • $250 per extra color / colors of if in a different sheen or paint product.
  • All walk in closets will have white ceilings and the according wall color.
  • All regular closets will be 1 color through out (ceilings will be in the wall paint).

 

INTERIOR PAINTING PROVISIONS

 

  • To be completed in 2 stages.
  • Stage 1 includes drywall sealer, an additional coat on the walls, and final 2 coats on the ceilings.
  • Stage 2 finalize to completion.

 

  • All finished floors including concrete in the garage is to be covered at least 90 % by the general contractor.
  • All drywall in the entire house including the garage is to be ready at the same time before I begin sealing the house.
  • Areas to be swept clean of all construction debris, sockets to be vacuumed out before sealer stage begins.
  • If the sealer is done in separate sections a $500 spilt fee will incur.
  • Once the ceilings are completed all pot lights and none hanging lighting under 6 inches are to be installed and energized before the 2nd stage begins.

 

  • The house is to be swept, clean of any construction waste before we’re expected to commence work for the 2nd stage.
  • No other trades in the unit while our team is there. A $35 fee / hr / person would be charged otherwise.
  • Shelving in the closets to be installed after trim and walls are painted. An extra $100 to $500 per closet fee if installed before hand.
  • Toilets to be installed after trim and walls are completed. An extra $60 per toilet if installed before hand.
  • Power, sufficient heat and water to be provided by the GC.

 

  • If I do any work outside the above scope an hourly charge of $65 per hour plus materials will be charged out.
  • This includes cleaning up after other trades.
  • Once there is any furniture moved into the unit all work there after will be considered extra.
  • Job is completed in 2 phases
  • Anything there after will be considered extra if there is any trade damage and or additional trim or doors added after my second and final visit.

 

NOT INCLUDED

 

  • Stain grade wood, fiber glass gel stain
  • Soffits
  • exterior or interior handrails.
  • stair treads or risers
  • wainscotting, passthroughs, cabinets, shelving, crown moulding
  • adjacent buildings, sheds, etc.
  • Front doors wider than 40 inches.

 

Updated
January 26, 2022 @ 3:38 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:38 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:38 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:39 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:40 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:40 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:40 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:40 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:40 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:41 pm

Estimate updated by Tonow Tokunaga.

Updated
January 26, 2022 @ 3:41 pm

Estimate updated by Tonow Tokunaga.